BOQ format

How to quote civil work work

Demolition, masonry, plastering and waterproofing on an interior BOQ, and why civil is the section that overruns when the site is opened up.

The unit

Mixed — area for surfaces, volume for masonry, count for openings

Civil is the one section that cannot use a single unit. Plastering is sqft, a brick wall is priced by area at a stated thickness, and a new opening is a count. Forcing it into one unit is how the scope stops being readable.

What the BOQ breaks into

LineUnitWhy it is its own line
DemolitionsqftPer surface removed. Say what is being taken down.
Debris removaltripIts own line. Municipal disposal charges are real money.
Brickwork / block worksqftAt a stated thickness — 4 inch and 9 inch are different walls.
PlasteringsqftInternal and external at different rates.
WaterproofingsqftWet areas. State the system and the warranty.
New openings / lintelsnos

The specs that decide the rate

Wall thickness
4 inch versus 9 inch changes material, labour and the floor area the client ends up with.
Waterproofing system
Chemical coating, membrane or box-type, and how many coats. The one civil line that produces a claim years later.
Making good
Whether the rate includes restoring adjacent surfaces disturbed during the work.

"As per site condition" is an open cheque in both directions

Civil is quoted before anything is opened up, so a provisional line is honest. What is not honest is leaving it undefined: write what the assumption is, what would change it, and how the revised figure gets agreed. A variation raised against a stated assumption is a conversation; one raised against a blank is an argument.

Houscade writes this breakdown for you, room by room, and the client approves it on their phone. See a real quotation.